Phase check cartridge, Phase check cartridge -13, Cylinder assembly torques -13 – JLG E300 Service Manual User Manual

Page 155: Cylinder valve torques -13

Advertising
background image

SECTION 5 - HYDRAULICS

3121253

– JLG Lift –

5-13

4. Push the piston to the rod assembly to the end of

the thread and then install the piston nut. When
installing the piston nut, gland and valve, refer to
Table 5-1, Cylinder Assembly Torques.

5. Assemble the rod assembly equipped with gland,

piston and piston nut to the barrel assembly hori-
zontally (avoid pushing it off-center, which could
cause damage to the piston seal or the outside of
the piston).

6. Push the gland thread until it meets the barrel

threads, and then assemble the gland to the barrel.

Phase Check Cartridge

The phase valve is a back-to-back pair of check valves,
one of which is mechanically actuated. This valve is
installed in the piston of the level cylinder and is used to
keep the master and level cylinders in phase.

NOTE: Activating the Level Override Up circuit for 30 sec-

onds can bleed the level circuit.

TEST PROCEDURE

1. Place the machine in the following position:

• Firm and level surface
• Upper boom horizontal (level)
• Upper boom fully retracted
• Jib down
• Platform empty

2. With no load in the platform, activate Level Up for

approximately 20 seconds. If the Upper Boom rises,
the phase valve is not functioning correctly and must
be replaced.

Table 5-1. Cylinder Assembly Torques

Cylinder

Torque Value *

Cylinder Head

Piston Nut

Tower Lift

463 lb. ft. (628 Nm)

267 lb. ft. (362 Nm)

Upper Lift

550 lb. ft. (746 Nm)

528 lb. ft. (716 Nm)

Master

463 lb. ft. (628 Nm)

267 lb. ft. (362 Nm)

Level

463 lb. ft. (628 Nm)

267 lb. ft. (362 Nm)

Telescope (AJ)

318 lb. ft. (431 Nm)

267 lb. ft. (362 Nm)

Jib

405 lb. ft. (549 Nm)

267 lb. ft. (362 Nm)

Steer

463 lb. ft. (628 Nm)

267 lb. ft. (362 Nm)

Telescope (AJP)

318 lb. ft. (431 Nm)

267 lb. ft. (362 Nm)

* All torque values ± 10%

Table 5-2. Cylinder Valve Torques

Cylinder

Valve

Ft. Lbs.

Nm

Tower Lift

Counterbalance

25-30

34-40.5

Poppet

19-21

25-28

Check Valve

20

27

Coil Nut

4-5

5-6

Upper Lift

Counterbalance

25-30

34-40.5

Poppet

19-21

25-28

Check Valve

20

27

Coil Nut

4-5

5-6

Level

Counterbalance

25-30

34-40.5

Telescope-AJ

Counterbalance

25-30

34-40.5

Load Shuttle

18-20

24.5-27

Jib

Counterbalance

25-30

34-40.5

Telescope-AJP

Counterbalance

25-30

34-40.5

Load Shuttle

18-20

24.5-27

Advertising