Adjustments made at the boom function valve bank – JLG E300 Service Manual User Manual

Page 158

Advertising
background image

SECTION 5 - HYDRAULICS

5-16

– JLG Lift –

3121253

Adjustments made at the Boom Function
Valve Bank

JIB LIFT UP – 2000 PSI (138 BAR)

1. Install pressure gauge at port MP of Main Valve

Bank.

2. Activate Jib Lift Up and hold to end of stroke. Take

pressure reading.

3. After loosening relief valve jam nut, adjust valve

clockwise to increase pressure or counterclockwise
to reduce pressure accordingly.

4. Tighten relief valve jam nut and repeat step 2 to ver-

ify setting.

JIB LIFT DOWN – 1200 PSI (83 BAR)

1. Install pressure gauge at port MP of Main Valve

Bank.

2. Activate Jib Lift Down and hold to end of stroke.

Take pressure reading.

3. After loosening relief valve jam nut, adjust valve

clockwise to increase pressure or counterclockwise
to reduce pressure accordingly.

4. Tighten relief valve jam nut and repeat step 2 to ver-

ify setting.

JIB UP
RELIEF VALVE

JIB DOWN
RELIEF VALVE

Advertising