7 function speeds, Test notes, Machine orientation when doing speed tests – JLG E300 Service Manual User Manual

Page 16: Function speeds -4

Advertising
background image

SECTION 1 - SPECIFICATIONS

1-4

– JLG Lift –

3121253

1.7 FUNCTION SPEEDS

Test Notes

1. Stop watch should be started with the function, not

with the controller or switch.

2. Drive test results reflect standard size tires.

3. All speed tests are run from the platform. These

speeds do not reflect the ground control operation.

4. The platform speed knob control must be at full

speed (turned clockwise completely).

5. Function speeds may vary due to cold, thick hydrau-

lic oil. Test should be run with the oil temperature
above 75° F (24° C).

6. Some flow control functions may not work with the

speed knob clicked into the creep position.

Machine Orientation When Doing Speed
Tests

NOTE: All tests are to be performed on a smooth, level sur-

face.

Lift: Boom Retracted. Telescope Retracted. Lift Up,
Record Time, Lift Down, Record Time.

Swing: Boom at Full Elevation. Telescope Retracted.
Swing the Turntable to the end stop. Swing the Opposite
Direction, Record Time.

Telescope: Boom at Full Elevation; Telescope Retracted;
Telescope Out, Record Time. Telescope In, Record Time.

Drive: Test to be done on a smooth level surface. Start
approximately 25 ft. (7.62 m) from starting point so that
the unit is at maximum speed when starting the test.
Results should be recorded for a 200 ft. (60.96 m) course.
Drive Forward, record time. Drive Reverse, Record Time.

Drive (Above Horizontal): Test should be done on a
smooth level surface. The Platform Speed Knob should be
selected out of the creep speed. This verifies that the
switches are working when the boom is above horizontal.
Results should be recorded for a 50 ft. course. Drive For-
ward, Record Time. Drive Reverse, Record Time.

Platform Rotate: Platform level and completely rotated
one direction. Rotate the opposite direction, Record Time.
Rotate the other direction, Record Time.

Jib: Platform level and centered with the boom. Start with
the Jib down. Jib Up, Record Time. Jib Down, Record
Time.

Lower Lift: Upper Boom horizontal, Telescoped In. Lower
Lift Up, Record Time. Lower Lift Down, Record Time.

Jib Swing: Platform level and centered with the boom.
Start with Jib at Horizontal. Begin with Jib Swing fully to
Left. Swing fully to Right, Record Time. Swing fully to Left,
Record Time.

Table 1-9. Function Speeds

Function

Speed

in seconds (unless

otherwise noted)

Main Lift Up

24-27

Main Lift Down

20-23

Swing - Right & Left

75-90

Telescope Out

8-12

Telescope In

8-12

Platform Rotate, Left and Right*
*Max. 15% difference between left and right

20-24

Jib Up

22 - 25

Jib Down

22 - 25

Jib Swing (300AJP)

20-35

Lower Lift Up

17 - 20

Lower Lift Down

17 - 20

Travel Speed (Forward & Reverse)
High drive

3 mph (4.8 kmh)

(45-50 sec / 200 ft.)

Travel Speed (Forward & Reverse)
Boom Above Horizontal

0.3 mph (0.5 kmh)

(110-120 sec / 50ft.)

4150273-O

Advertising