7 ground control station, Ground control station -6 – JLG R6 User Manual

Page 38

Advertising
background image

SECTION 3 - MACHINE CONTROLS, INDICATORS AND OPERATION

3-6

– JLG Lift –

3121684

3.7

GROUND CONTROL STATION

DO NOT OPERATE FROM GROUND CONTROL STATION WITH PERSONNEL IN
THE PLATFORM EXCEPT IN AN EMERGENCY.

PERFORM AS MANY PRE-OPERATIONAL CHECKS AND INSPECTIONS FROM
THE GROUND CONTROL STATION AS POSSIBLE.

Figure 3-3. Ground Control Station

1. Platform Lift/Lower Switch

2. Key Selector Switch

3. Ground Emergency Stop Button

4. MDI - Indicator

5. Overload Indicator

1001132360A

1

2

3

4

5

1001146979A

Advertising