4 daily walk-around inspection, 4 daily walk-around inspection -5, See section 2.4 on – JLG 10MSP Operator Manual User Manual
Page 23
SECTION 2 - PREPARATION AND INSPECTION
3121227
– JLG Lift –
2-5
7. Function Check - Check all machine controls for opera-
tion. (See Section 2.5 on page 2-8)
If optional equipment is installed on this machine refer to Section 3
for specific Pre-Start Inspection and Operation instructions.
2.4 DAILY WALK-AROUND INSPECTION
Begin the “Walk-Around Inspection” at item one (1) as noted on
the diagram (See Figure 2-1. on page 2-6). Continue around
machine checking each item in sequence for the conditions listed
in the following check list.
TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS “OFF” DUR-
ING “WALK-AROUND INSPECTION”.
DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN COR-
RECTED.
DO NOT OVERLOOK VISUAL INSPECTION OF THE BASE FRAME
UNDERSIDE. CHECK THIS AREA FOR OBJECTS OR DEBRIS WHICH
COULD CAUSE EXTENSIVE MACHINE DAMAGE.