Cgs sensor wired directly to ud10, Ud10 wired to cgs sensor with stb termination box – Det-Tronics UD10 FlexVu Explosion-Proof Universal Display Unit User Manual

Page 65

Advertising
background image

4.2

95-8661

M-2

NOTE 1 REMOVE UD10 ELECTRONICS MODULE FOR ACCESS

TO CGS INTERFACE BOARD (NO TOOLS REQUIRED).

NOTE 2 HOUSINGS MUST BE ELECTRICALLY CONNECTED TO

EARTH GROUND.

CGS INTERFACE BOARD

LOCATED INSIDE

UD10 HOUSING

B2507

CONNECT TO UD10 MODULE VIA

CABLE (FACTORY INSTALLED)

CGS INTERFACE BOARD

CGS

SENSOR

SW1

J3

BLK

WHT

RED

1

2

3

P10

J10

J11

CONNECT CGS SENSOR

TO TERMINAL J10

SET ALL SWITCHES

TO THE “ON” POSITION

(FACTORY DEFAULT SETTING)

TERMINAL J11 FOR FACTORY USE ONLY

SHIELD

C

ALIBR

A

TE

24 VDC

4-20 mA

24 VDC

+

CGS Sensor Wired Directly to UD10

NOTE 1 REMOVE UD10 ELECTRONICS MODULE FOR ACCESS

TO CGS INTERFACE BOARD (NO TOOLS REQUIRED).

NOTE 2 HOUSINGS MUST BE ELECTRICALLY CONNECTED TO

EARTH GROUND.

CGS INTERFACE BOARD

LOCATED INSIDE

UD10 HOUSING

B2508

CONNECT TO UD10 MODULE VIA

CABLE (FACTORY INSTALLED)

CGS INTERFACE BOARD

SW1

J3

BLK

WHT

RED

1

2

3

P10

J10

J11

SET ALL SWITCHES

TO THE “ON” POSITION

(FACTORY DEFAULT SETTING)

TERMINAL J11 FOR FACTORY USE ONLY

CONNECT KEYED SENSOR

PLUG TO PIN CONNECTOR

CONNECT SHIELD TO EARTH GROUND

TERMINAL WITHIN UD10 HOUSING

CGS

SENSOR

BLK

WHT

RED

MODEL STB1

SENSOR TERMINATION BOX

SHIELD

C

ALIBR

A

TE

24 VDC

4-20 mA

24 VDC

+

UD10 Wired to CGS Sensor with STb Termination box

Advertising