INFICON Composer Elite Gas Concentration Monitor User Manual

Page 126

Advertising
background image

7 - 4

PN

07

4-

56

6-

P1

B

Composer Elite Operating Manual

1

If not already removed, remove the plugs from the Acoustic Sensor’s two
VCR-2 service ports (see

Figure 7-2

). When removing the plugs,

simultaneously use two wrenches to avoid stress and damage
to the service ports.

Figure 7-2 Acoustic sensor - inlet/outlet tubes, service ports, and helium injection ports

2

Connect a helium leak detector to either of the two service ports.

3

Evacuate the Secondary Containment Chamber (beneath the service port) by
following the leak detector manufacturer’s recommendations.

4

Connect the helium injection needle (included in the ship kit) to a helium
source. Immerse the needle in liquid and adjust the helium flow for a constant
bubble rate of at least two bubbles per second.

5

Locate the two helium injection ports farthest from the Acoustic Sensor inlet
and outlet tubes (refer to

Figure 7-2

). Insert the entire length of the needle into

the more easily accessible of the two helium injection ports.

6

Allow the helium to flow into the Acoustic Sensor for at least one minute. If there
is a large leak, the leak rate will quickly exceed 1x10

-9

cm

3

/s. For smaller leaks,

a gradual pressure increase will be visible. In this case, keep the needle in
place for three minutes. The leak rate should not exceed 1x10

-9

cm

3

/s.

NOTE: Contact INFICON if the leak rate exceeds 1x10

-9

cm

3

/s.

Helium Injection Ports

Outlet Tube

Inlet Tube

Service Ports

Helium Injection Ports

(farthest from inlet/outlet tubes)

(closest to inlet/outlet tubes)

Advertising