2 packing and setting up the instrument, Packing and setting up the instrument, Installation – Leica Biosystems VT1200/VT1200 S User Manual

Page 18

Advertising
background image

16

Instructions for Use V 1.4 RevC – 09/2013

4.2 Packing and setting up the instrument

4. Installation

1. Have 2 people grab the instrument by the transport handles (1), place it

on the wooden pallet and screw it to the pallet using the 4 size 6 Allen

screws (2).

2. Pull the transparent protective hood (3) over the instrument. Place the

wooden box (4) on the baseplate. Insert the inner carton ring (5).

3. Insert the accessories box (6 – contains accessories) and fill it with

packing material (7).

4. Attach the cover (8) and screw it into place using 8 Phillips screws (9).

1

1

2

2

Packing the instrument

3

5

4

6

7

8

9

9

Fig. 12

Before each transport, the handles must be screwed onto the instrument using the

provided screws (

see Fig. 13

). Check to ensure that the handles are firmly in place

and will hold reliably!

Ensure that the instrument is standing on a work surface that is as free

of vibrations as possible.

Advertising