4.3 Before commissioning the instrument
1
1
Fig. 13
Once the instrument is in its final location, un-
screw the transport handles (1) from the instru-
ment using the size 6 Allen key provided and
store them, along with the screws, in a safe
place.
1. Set the power switch (7) on the right side of
the instrument to OFF ().
2. Make sure the power cable is correctly con-
nected in the power socket (2) on the right side
of the instrument.
3. Connect the control panel to the socket (3).
4. Install the ice tray (4).
5. Install the buffer tray (5).
6. Install any optional. accessories, such as the
magnifier, microscope, foot switch, etc. ac-
cording to p. 49.
7. Use the power switch (7) to switch on the
instrument.
2
7 (AN)
5
3
4
6
Fig. 14
To make it easier to insert the speci-
men, adjust the specimen receptacle to
its lowest position, and adjust the blade
holder to its rearmost position during
the first reference run.