Moving the load fame, Unloading, Moving the load fame 49 – MTS Criterion 60 - Manual User Manual
Page 49: Unloading 49
![background image](/manuals/568018/49/background.png)
Moving Frames and Integrated Operations Platform
MTS Criterion™ Series 60 Product Manual
Installation
49
Moving the Load Fame
Unloading
The customer will be responsible for all the unloading process if no Unloading
Service is purchased. In case of special agreement, an MTS field service engineer
can monitor the unloading, storage, and transportation process.
To unload the load frame:
1. Unload the load frame with reference to the lifting position marker
and the gravity center marker
.
2. Choose suitable slings according to the weight table.
3. Lift the crate with suitable slings as shown in the following figure.
4. Pay attention to the gravity center marker
on the crate to ensure
stable and balanced lifting.
Note
If the machine will not be installed right away, store it in a steady, dry and
corrosion free place. MTS is not responsible for damages caused by
improper storage.