Operation, Operation 75 – MTS Criterion 60 - Manual User Manual

Page 75

Advertising
background image

MTS Criterion™ Series 60 Product Manual

Operation

75

Operation

This section describes the actions performed during normal, day-to-day operation
of the MTS Criterion Series 60 systems. For information on using the system in
actual testing, refer to the testing software manual.

Contents

Travel Limit Switches (Physical Limits) 76

Crush Zone Hazards 77

Integrated Operations Platform Control Panel 78

Motion Control 79

Handset Control 81

Operating the test system requires specialized knowledge.

If unqualified personnel operate the system, personal injury or equipment
damage an occur.

Ensure that the frame is only operated by qualified, trained personnel.

Keep bystanders away during system operation.

WARNING

Advertising