Moving the integrated operations platform, Unloading, Moving the integrated operations platform 56 – MTS Criterion 60 - Manual User Manual

Page 56

Advertising
background image

MTS Criterion™ Series 60 Product Manual

56

Moving Frames and Integrated Operations Platform

Installation

Moving the Integrated Operations Platform

Unloading

Choose suitable slings according to the Integrated Operations Platform and crate
weight. Wrap the sling through the crate pallet and raise it.

Moving the Integrated Operations Platform to Its Final Location

To move the Integrated Operations Platform:

1. Unpack the Integrated Operations Platform.

2. Choose suitable chains according to the Integrated Operations Platform

weight.

3. Attach the chains to the customer-supplied hoist rings (M16) on the

Integrated Operations Platform and hang the other end to the hook.

Advertising