Step 4: power wiring, Grounding requirements, Shield termination - shld – Rockwell Automation 20D PowerFlex 700S Phase II Drive Frames 1...6 Installation Instructions User Manual

Page 25

Advertising
background image

Rockwell Automation Publication 20D-IN024C-EN-P - July 2013

25

PowerFlex 700S Adjustable Frequency AC Drive - Phase II Control

Step 4: Power Wiring

Grounding Requirements

The drive Safety Ground-PE must be connected to system ground. Ground
impedance must conform to the requirements of national and local industrial
safety regulations and/or electrical codes. The integrity of all ground connections
should be periodically checked.

Figure 11 - Typical Grounding

Shield Termination - SHLD

The Shield terminal (see page

39

) provides a grounding point for the motor cable

shield. It must be connected to an earth ground by a separate continuous lead.
The motor cable shield should be connected to this terminal on the drive and the
motor frame. Use a shield terminating or EMI clamp to connect shield to this
terminal.

ATTENTION: National Codes and standards (NEC, VDE, BSI and so forth) and
local codes outline provisions for safely installing electrical equipment.
Installation must comply with specifications regarding wire types, conductor
sizes, branch circuit protection and disconnect devices. Failure to do so may
result in personal injury and/or equipment damage.

U (T1)
V (T2)

W (T3)

R (L1)

S (L2)

T (L3)

PE

SHLD

Advertising
This manual is related to the following products: