ADS Environmental Services IETG FlowHawk QR 775012 A4 User Manual

Page 142

Advertising
background image

4-24

IETG FlowHawk Manual

Forming a thin taper using vinyl tape

4. Excavate a trench at least 305 mm (12 in) deep and 102

millimeters (4 in) wide from the EMU/power source location to
the monitor location. Consult local regulations to verify the
required trench depth for the area.

5. Drill a 13-milllimeter (½-in) (minimum) hole through the corbel

(structural foundation holding the manhole cover) or manhole
wall to provide a smooth transition for the cable into the trench.

6. Run the communication cable from the monitor location in the

manhole to the EMU/power source location. If required by
local code, run cable through 19-millimeter (¾-in) electrical
PVC conduit in the following way:

 Extend the conduit through the manhole corbel or wall at

the monitor location.

 Lay the conduit in the trench per local regulations and feed

the communication cable through the conduit.

 Extend the conduit approximately 305 mm (12 in)

vertically out of the trench (from the ground surface) at the
designated EMU/power source location.

 Use urethane foam to seal the space between the conduit

and the corbel or manhole wall to prevent infiltration into
the manhole.

Advertising