AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 6

Advertising
background image


GF-135

Esteem 399 Low NOx Boiler

OMM-0089_0A

Installation, Operation & Maintenance Manual

12.4.3 Gas Piping Inspection................................................................................................................................ 94

12.4.4 Flame Pattern and Combustion Verification ............................................................................................ 94

12.4.5 Measure and Verify Input Rating - Natural Gas Only................................................................................ 96

12.4.6 High Temperature Limit Testing ............................................................................................................... 97

CHAPTER 13:

OUTDOOR RESET CONTROL .................................................................................. 99

13.1 OUTDOOR TEMPERATURE SENSOR INSTALLATION ....................................................................................... 100

13.2 OUTDOOR TEMPERATURE SENSOR WIRING ................................................................................................. 101

CHAPTER 14:

EXTERNAL MODULATING CONTROL ................................................................... 103

14.1 WIRING THE EXTERNAL MODULATING CONTROLLER ................................................................................... 103

14.2 EZ-SETUP CONTROLLER PROGRAMMING FOR EXTERNAL 0-10V SIGNAL ...................................................... 103

14.3 EXTERNAL PROGRAMMING OF 0-10V MODULATING CONTROL ................................................................... 103

CHAPTER 15:

CHECK-OUT PROCEDURES .................................................................................. 105

CHAPTER 16:

MAINTENANCE SCHEDULE .................................................................................. 107

16.1 SERVICE TECHNICIAN MAINTENANCE ........................................................................................................... 107

16.1.1 General Maintenance ............................................................................................................................. 107

16.1.2 Poor Performance Maintenance ............................................................................................................ 107

16.1.3 Owner Maintenance ............................................................................................................................... 107

CHAPTER 17:

MAINTENANCE PROCEDURES ............................................................................. 109

17.1 REPORTED PROBLEMS ................................................................................................................................... 109

17.2 SURROUNDING AREA INSPECTION ................................................................................................................ 109

17.3 BURNER AREA INSPECTION ........................................................................................................................... 109

17.4 SYSTEM PIPING INSPECTION .......................................................................................................................... 110

17.5 CLEAN CONDENSATE DRAIN ASSEMBLY ........................................................................................................ 110

17.6 VENTILATION AIR OPENINGS INSPECTION .................................................................................................... 110

17.7 VENT AND COMBUSTION AIR PIPING INSPECTION........................................................................................ 110

17.8 BOILER SYSTEM INSPECTION ......................................................................................................................... 111

17.9 EXPANSION TANK INSPECTION ...................................................................................................................... 111

17.10 BOILER RELIEF VALVE INSPECTION .............................................................................................................. 111

17.11 IGNITION ELECTRODE INSPECTION .............................................................................................................. 112

17.12 IGNITION WIRING AND GROUND WIRING INSPECTION .............................................................................. 112

17.13 CONTROL WIRING INSPECTION ................................................................................................................... 112

17.14 CONTROL SETTINGS INSPECTION ................................................................................................................ 112

17.15 PERFORM START-UP AND CHECKOUT PROCEDURES .................................................................................. 112

17.16 BURNER FLAME INSPECTION AND TROUBLESHOOTING ............................................................................. 113

17.17 FLAME SIGNAL INSPECTION ......................................................................................................................... 114

17.18 COMBUSTION LEVELS INSPECTION.............................................................................................................. 114

17.19 FLUE GAS TEMPERATURE CHECK ................................................................................................................ 114

17.20 HEAT EXCHANGER CLEANING...................................................................................................................... 115

17.21 REVIEWING MAINTENANCE REQUIREMENTS WITH OWNER ...................................................................... 115

17.22 Handling Previously Fired Combustion Chamber Insulation ....................................................................... 116

CHAPTER 18:

EZ-SETUP CONTROLLER OPERATION AND SETTINGS ..................................... 117

18.1 ENTERING THE INSTALLER ACCESS CODE ...................................................................................................... 117

18.2 USING THE INSTALLER MENU ........................................................................................................................ 118

18.3 CH and DHW SETTINGS MENU

................................................................................................................ 121

18.3.1 Heating Operation (Default: Enabled) .................................................................................................... 121

18.3.2 Demand Type (Default: Switch & Outdoor Reset) .................................................................................. 122

Page 6 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0089_0A

MC1 06/19/14

Ph.: 800-526-0288

Advertising