Carrier 50TCA04-A07 User Manual

Page 16

Advertising
background image

16

6. For units with an economizer, the sampling tube is in-

tegrated into the economizer housing but the connec-

tion of the flexible tubing to the sampling tube is the

same.

C08127

Fig. 22 -- Return Air Sensor Operating Position

FIOP Smoke Detector Wiring and Response

All units: FIOP smoke detector is configured to

automatically shut down all unit operations when smoke

condition is detected. See Fig. 23, Smoke Detector

Wiring.

Highlight A: JMP 3 is factory--cut, transferring unit

control to smoke detector.

Highlight B: Smoke detector NC contact set will open on

smoke alarm condition, de--energizing the ORN

conductor.

Highlight C: 24--v power signal via ORN lead is removed

at Smoke Detector input on LCTB; all unit operations

cease immediately.

PremierLink Control: Unit operating functions (fan,

cooling and heating) are terminated as described above. In

addition:

Highlight D: On smoke alarm condition, the smoke

detector NO Alarm contact will close, supplying 24--v

power to GRA conductor.

Highlight E: GRA lead at Smoke Alarm input on LCTB

provides 24--v signal. This signal is conveyed to

PremierLink FIOP’s TB1 at terminal TB1--6 (BLU lead).

This signal initiates the FSD sequence by the PremierLink

control.

Using Remote Logic: Five conductors are provided for

field use (see Highlight F) for additional annunciation

functions.

Additional Application Data — Refer to Catalog No.

HKRNKA--1XA for discussions on additional control

features of these smoke detectors including multiple unit

coordination. See Fig. 23.

A

E

F

C

D

B

C08246

Fig. 23 -- Typical Smoke Detector System Wiring

50TC

Advertising