Installation / performance check list – Reznor R6GN Option - Installation - High Static Blower Drive - Light Commercial User Manual

Page 36

Advertising
background image

7088000 (Replaces 708435A)

Specifi cations & illustrations subject to change without notice or incurring obligations.
O’ Fallon, MO | Printed in U.S.A. (08/10)

¢708800{¤

INSTALLATION / PERFORMANCE CHECK LIST

INSTALLER NAME:

CITY _______________________

STATE ________________

BLOWER SYSTEM:

Blower Motor HP:______________________________________

Sheave Setting: ________________________________turns open

System Static:______________________________E.S.P. (in -Wg)

ELECTRIC HEAT / GAS HEAT EXCHANGER:

Heater Kit Installed?

YES

NO

Heater Kit Model #: _____________________________________

Furnace Input: _____________________________________(Btuh)

Return Air Temp: ____________________________________°F

Supply Air Temp: ____________________________________°F

Temperature Rise: ___________________________________°F

INSTALLATION ADDRESS:

CITY _______________________ STATE _____________________

UNIT MODEL # ____________________________________________

UNIT SERIAL # ____________________________________________

HSDK PART # _____________________________________________

INSTALLER:

PLEASE LEAVE THESE INSTALLATION

INSTRUCTIONS WITH THE OWNER

Advertising