3 work rules, 1 work rules, 2 necessary documents – AEC HE Mass Flow Series Drying hoppers User Manual

Page 14

Advertising
background image

HE

CHEBCHE Mass Flow Series Drying Hoppers

Page 13

3 Work

Rules

3-1 Work

Rules

The installation, operation, and maintenance of this equipment must be conducted in accordance
with all applicable work and safety codes for the installation location. This may include, but is
not limited to, OSHA, NEC, CSA, and any other local, national and international regulations.

; Read and follow these operating instructions when installing, operating and maintaining this

equipment. If the instructions become damaged or unreadable, you can obtain additional
copies from AEC/Whitlock.

; Only qualified personnel familiar with this equipment should work on or with this

equipment.

; Work with approved tools and devices.
; Disconnect the electricity before maintenance or service.
; Always work from a stable, debris-free work platform.
; Remove any debris from the blower suction area.

3-2 Necessary

Documents

The documents listed below are necessary for the operation, installation, and maintenance of
AEC/Whitlock drying hopper systems. Additional copies are available from AEC, Inc.

Familiarize the appropriate personnel with these documents:

• This manual.
• The electrical schematic included in the customer information packet.
• The Customer Spare Parts List included in the information packet.
• Operation and installation manuals for the dryer, optional controls or auxiliary equipment

in the drying system.

Advertising
This manual is related to the following products: