3 shutting down the process – AEC HE Mass Flow Series Drying hoppers User Manual

Page 23

Advertising
background image

Page 22

HE

CHEBCHE Mass Flow Series Drying Hoppers

4-3 Shutting Down the Process

Caution!

Allow the drying hopper to cool before handling.

1. Turn off the conveying system supplying the drying hopper, dryer and drying hopper

controls. If desired, empty the hopper.

2. When processing is complete, close the hopper slide gate and shut down any in-line

companion equipment, such as an Aftercooler.

3. Turn the dryer and drying hopper off.

4. For maintenance or long-term shut down, open (de-energize) the electrical disconnect at

the dryer, drying hopper and the one in your power drop.

Advertising
This manual is related to the following products: