1

General

Information

.................................................

7

1-1 Introduction
1-2 Equipment

Function

1-3

The HE Heater Drying Hopper Package

1-4

The CHE Control and Heater Drying Hopper Package

1-5

The BCHE Blower Controls Heater Drying Hopper Package

2

Shipping

Information ............................................. 11

2-1 Unpacking

and

Inspection

2-2

In the Event of Shipping Damages

2-3

If the Shipment is Not Complete

2-4

If the Shipment is Not Correct

2-5 Returns

3

Installation

...............................................................

13

3-1 Work

Rules

3-2 Necessary

Documents

3-3

Installing Machine-Mount Drying Hoppers

3-4 Installing

Floor-Mount Drying Hoppers

3-5

Making Hose Connections

3-6

Making Electrical Connections

3-7

Checking for Proper Blower Rotation

4

Startup, Shutdown, and Operation ....................... 21

4-1 Pre-Startup

Checklist

4-2

Starting the Process

4-3

Shutting Down the Process