Preventive maintenance checklist – AEC HE Mass Flow Series Drying hoppers User Manual

Page 56

Advertising
background image

HE

CHEBCHE Mass Flow Series Drying Hoppers

Page 55

Preventive Maintenance Checklist

AEC/Whitlock HE

• CHE • BCHE Mass Flow Drying Hoppers

System model #

Serial #

Every week

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Inspect all filters for
wear, replace/
clean if dirty or
worn.

Check air regulator
to make sure pres-
sure is 60-80 psi
(413.7 to 551.6 kPa
/4.1 to 5.5 bars). (If
applicable)

Every month

Jan Feb Mar Apr May

Jun

Jul

Aug

Sep Oct Nov

Dec

Lock out electrical
power and inspect
electrical wiring for
integrity.

Lock out electrical
power and check
heater elements for
continuity using an
ohmmeter.

Check dew point
and temperature
tracking with an
external dew point
monitor and
pyrometer.

Visually inspect the
shifting of the
airflow valve during
one cycle.

Every year

Next scheduled

inspection

Actual inspection

Date/By

Next scheduled

inspection

Actual inspection

Date/By

Inspect desiccant.
Replace if brown or
broken.

Every two years

Scheduled

replacement date

Actual replacement

Date/Work done by

Scheduled

replacement date

Actual replacement

Date/Work done by

Replace desiccant.






- Photocopy this page for your maintenance records -

Advertising
This manual is related to the following products: