SMA STP 10000TL-10 Installation User Manual

Page 24

Advertising
background image

5  Mounting

SMA Solar Technology AG

24

STP10-17TL-IA-en-32

Installation Manual

3. Hook the inverter into the rear panel, ensuring that

the inverter enclosure is positioned flush against the
rear panel.
– For two people to transport the inverter, hold the

inverter by the recessed grips at the bottom and
the top edge of the enclosure lid.

– For transport by crane, you can attach two ring

bolts to the top of the inverter (see A: M10,
diameter = 10 mm). To do this, remove the
filler-plugs and screw in the ring bolts as far as
they will go.

4. Remove the ring bolts after transport and re-attach the filler-plugs.
5. Release all six captive screws of the lower

enclosure lid.

6. To remove the lower enclosure lid, lift it from the

bottom.

7. Screw the supplied eye bolt into the hole provided

in order to secure the enclosure from being
dislodged. The eye bolt only needs to be fastened
hand-tight.

A

Advertising
This manual is related to the following products: