6  Electrical Connection

SMA Solar Technology AG

46

STP10-17TL-IA-en-32

Installation Manual

6.5.1 Checking the Country Standard

Check whether the inverter is set to the country of installation.

Before commissioning:

• Check that the country standard of the inverter is correct by comparing the default settings of

the inverter listed on the supplementary sheet provided.

After commissioning:

• Check that the country standard is correct by checking the display message during

(re-)commissioning (see Section 7 "Commissioning", page 56).
or

• Check that the country standard is correct using the "SMA grid guard" measuring channel via

a communication product.

The settings of each country data set are specified in the operating parameters. The parameters can
be read out using a communication product. The description of the operating parameters is available
at www.SMA-Solar.com in the category "Technical Description" of the respective inverter.

Display language
Once you have set the country standard, you can always set the display language later using
rotary switch B. However, you have to then set rotary switch A to "0" in order to keep the
country data set.

(A) (B) Country data set

Display language

Grid Guard
protection

Country

0

0

default settings

default settings

dependent on
parameter set

dependent on
parameter set

0

1

retained

English

dependent on
parameter set

dependent on
parameter set

0

2

retained

German

dependent on
parameter set

dependent on
parameter set

0

3

retained

French

dependent on
parameter set

dependent on
parameter set

0

4

retained

Spanish

dependent on
parameter set

dependent on
parameter set

0

5

retained

Italian

dependent on
parameter set

dependent on
parameter set

0

6

retained

not assigned*

dependent on
parameter set

dependent on
parameter set