SMA STP 10000TL-10 Installation User Manual

Page 63

Advertising
background image

SMA Solar Technology AG

9  Disconnecting the Inverter from Voltage Sources

Installation Manual

STP10-17TL-IA-en-32

63

7. Use a suitable multimeter to verify the absence of

voltage for L1, L2 and L3 to N at the AC terminal.
The maximum diameter of the test probe is 2 mm.
☑ If voltage is present, check the installation.

8. Verify the absence of voltage in L1, L2 and L3 to PE

at the AC terminal.
☑ If voltage is present, check the installation.

9. Verify the absence of voltage in the multi-function

relay to PE at all terminals.
☑ If voltage is present, check the installation.

PE

PE

Advertising
This manual is related to the following products: