6 Procedure A
26
YASKAWA TOEP YEACOM 06A V1000 Option PROFINET SI-EP3/V Installation Manual
8.
Loosen the screws attaching the NEMA Type 1 conduit bracket to the drive to
remove the NEMA Type 1 conduit bracket.
Figure 14
Figure 14 Remove the NEMA Type 1 Conduit Bracket
9.
Select one of the four different length ground wires packaged with the option,
. Choose the proper ground wire by first removing the ground terminal
screw from the drive
. Test fit the screw (size M3.5 to M6) into each of the
four ground drive-side ring lugs prior to installation. Ground wire selection varies by
drive model.
Figure 15
Figure 15 Ground Wire Selection
To Option ground screw FE
Screw size: M3
To drive ground terminal
Screw size: M3.5 to M6