Press setup key to begin, Setup and programming, Overview – Precision Digital PD941 User Manual

Page 21

Advertising
background image

ConsoliDator Multi-Channel Controller

Instruction Manual

21

SETUP AND PROGRAMMING

There is no need to recalibrate the instrument when first
received from the factory.
The device is factory calibrated prior to shipment, for all
input types. The calibration equipment is certified to NIST
standards.

Overview

Setup and programming are done
through the front buttons or ConsoliDator
Monitor Software. After power and signal
connections have been completed and
verified, apply power to the instrument.
Inputs, outputs, and relays are
configured individually. It is
recommended that all inputs be
configured before outputs and relays are
programmed.
Shown to the right is a typical screen that
appears upon first power-up. Actual
screens will vary with the amount of
inputs initially detected.
For information on button functions, see
NAVIGATING AND EDITING (page 20.)
To load software and program from a
PC, please familiarize yourself with the
ConsoliDator Monitor Software
(page 52) before you continue with
device setup.

SETUP

AUTO

ACK

NEXT

Ch1

Ch2

Ch3

Ch4

Ch 1:

Ch 2:

Ch 3:

Ch 4:

13.000

14.000

15.000

mA

mA

mA

mA

mA

12.000








Press SETUP key to begin.

Advertising
This manual is related to the following products: