Power on switch, Power on switch -2 – McDATA 4300 User Manual

Page 104

Advertising
background image

4-2

McDATA Sphereon 4300 Fabric Switch Installation and Service Manual

Repair Information

Power On Switch

To power on the switch:

1. An alternating current (AC) power cord is required for the power

supply. Ensure the correct power cord is available.

DANGER

Use the supplied power cords. Ensure the facility power
receptacle is the correct type, supplies the required voltage, and is
properly grounded.

2. Plug the power cord into a facility power source and the AC

connector at the rear of the switch. When the power cord is
connected, the switch powers on and performs power-on
self-tests (POSTs).

3. During POSTs:

— The green PWR LED on the switch front panel illuminates.

— The amber ERR LED on the switch front panel blinks

momentarily while the switch is tested.

— The green LED associated with the Ethernet port blinks

momentarily while the port is tested.

— The blue/green and amber LEDs associated with Fibre

Channel ports blink momentarily while the ports are tested.

4. After successful POST completion, the PWR LED remains

illuminated and all amber LEDs extinguish.

5. If a POST error occurs, go to

MAP 0000: Start MAP

to isolate the

problem.

Advertising