Sfp optical transceiver removal and replacement -4 – McDATA 4300 User Manual

Page 132

Advertising
background image

5-4

McDATA Sphereon 4300 Fabric Switch Installation and Service Manual

Removal and Replacement Procedures

6. Disconnect the fiber-optic jumper cable from the port:

a. Pull the keyed LC connector free from the port’s optical

transceiver.

b. Place a protective cap over the jumper cable connector.

7. The optical transceiver has a wire locking bale to secure the

transceiver in the port receptacle and to assist in removal. The
bale rotates up or down, depending on transceiver manufacturer
and port location (top or bottom row).

a. Disengage the locking mechanism by rotating the wire bale up

or down 90 degrees as shown in part (1) of

Figure 5-1

.

b. Grasp the wire bale and pull the transceiver from the port

receptacle as shown in part (2) of

Figure 5-1

.

Figure 5-1

SFP Optical Transceiver Removal and Replacement

8. At a web browser communicating with the EFCM Basic Edition

interface, select Event from the Logs menu. An event code 513
(SFP optics hot-removal completed) appears in the Event Log.

Replacement

To replace an SFP optical transceiver:

1. Ensure an ESD grounding cable is connected to the product

chassis (or approved bench ground) and your wrist.

2. Remove the replacement transceiver from its packaging.

3. Insert the transceiver into the port receptacle, then engage the

locking mechanism by rotating the wire bale up or down 90
degrees as shown in

Figure 5-1

.

Advertising