Rorke Data Galaxy HDX2 GHDX2-2430S-24F4D User Manual

Page 25

Advertising
background image

Galaxy GHDX2-2430S/R-24F4D Installation and Hardware Reference Manual

Introduction

1-10

Figure 1-10: BBU Module, Controller Top Cover, and the Module Slot

The BBU functionality consists of two major parts. One is the charger circuitry mounted

on top of the controller main board. The other is an optional BBU module that contains

several battery cells. On a single-controller configuration, the BBU is an optional

accessory. The BBU module is hot-swappable so it can be replaced while the subsystem

is running.

New Feature:

The battery cell packs come with an EEPROM to record the date of installation and other

service data; and when the approximate one-year life expectancy is reached (by checking

against the real-time-clock), system administrators will be notified for replacing the

BBU.

In accordance with international transportation regulations, the BBU is only charged to

between 35% and 45% of its total capacity when shipped. After powering on the

subsystem (see Section 4.1) the BBU will automatically start charging its battery cells. It

usually requires approximately twelve (12) hours for the battery to be fully charged.

The BBU is aware of its life expectancy as well as its charge level. Charge level

awareness helps avoid frequent re-charge.

1.2.7

Power Supply Units

The subsystem is equipped with three (3) hot swappable, 1U-profile, 405W PSU

modules. The PSU modules are located on the rear panel of the subsystem.

Advertising
This manual is related to the following products: