3 how to install, 1 how to get started, Af-650 gp high power operating instructions – GE Industrial Solutions AF-650 GP General Purpose Drive (460_575_690V 125HP and above) User Manual
Page 12
3 How to Install
3.1 How to Get Started
3.1.1 About How to Install
This chapter covers mechanical and electrical installations to and from power terminals and control card terminals.
Electrical installation of options is described in the relevant Operating Instructions and Design Guide.
3.1.2 How to Get Started
The frequency converter is designed to achieve a quick installation by following the steps described below.
Read the safety instructions before installing the unit.
Mechanical Installation
•
Mechanical mounting
Electrical Installation
•
Connection to Mains and Protecting Earth
•
Motor connection and cables
•
Fuses and circuit breakers
•
Control terminals - cables
Quick setup
•
Keypad
•
Auto tune
•
Programming
Unit size is depending on enclosure type, power range and mains voltage
Illustration 3.1: Diagram showing basic installation including mains, motor,
start/stop key, and potentiometer for speed adjustment.
AF-650 GP High Power Operating Instructions
11
3