Performing the, Cv subsystem functional verification test, Performing the cv subsystem functional – Agilent Technologies 85225F User Manual

Page 131: Verification test

Advertising
background image

CV Subsystem Functional Verification Test

D

Installation and User’s Guide

131

Performing the CV Subsystem Functional Verification Test

If the performance of the Agilent 4284A precision LCR meter is in
question, complete the following steps to verify operation.

To perform the RF subsystem functional verification test

Step

Action

Notes

1 Activate the precision LCR

meter.

a Connect the precision LCR meter to

line power.

b Switch on the line power.

2 Warm-up the network

analyzer for 1 hour.

a Wait 1 hour before continuing to

step 3.

3 Run the required self

tests.

a On the precision LCR meter front

panel, press CATALOG/SYSTEM >
SELF TEST.

b Enter the number corresponding to

the required self test and press
SELF TEST.

This opens the SELF TEST page.

For more information, see chapter 5
“Catalog/System Configuration” in the
Agilent 4284A precision LCR meter operation
manual.

Advertising