Installing the System

To prepare the installation site

64

Environmental Requirements

64

Electrical Requirements

64

To receive the system

65

To unpack the shipment crate containing the rack cabinet

66

To verify the shipment

68

To install the work surface

74

To ensure your safety while using the system

76

Precautions for Performing Floating-Ground Measurements

78

Precautions for Avoiding Electrostatic Discharge

79

To connect the bias networks

80

To switch on power to the system

87

This completes the installation process. To confirm the functionality of the

system, continue to Chapter 3, “Verifying System Functionality,”
starting on page 91.

89

Related Topics

“Introducing the Agilent 85225F Performance Modeling System"

on

page 17

Use this chapter to learn how to first prepare the installation site, and
then receive, unpack, install, and configure the system. This chapter
includes important information on operational safety, as well as
instruction on preparing the installation site, unpacking the system,
ensuring the completeness of the system shipment, installing the work
surface, performing final system configuration, and powering- on the
system.