Parameter analyzer, Lcr meter, Parameter analyzer or – Agilent Technologies 85225F User Manual

Page 146: Parametric measurement, Lan/gpib gateway

Advertising
background image

146

Installation and User’s Guide

Index

H

handle kit, rack mount and,

70

,

71

,

105

hard disk requirements, controller,

59

hardware setup, IC-CAP,

89

,

96

I

IC-CAP software

adding components,

89

,

96

adding interface,

96

changing SMU names,

96

configuring the interface,

89

DC characterization,

99

opening attenuator test model,

97

saving the hardware configuration,

100

setting network analyzer options,

97

starting the program,

89

,

96

user’s guide,

89

,

100

inspection

connector surfaces,

112

incoming shipment,

65

,

68

installation procedure,

64

instrument markings,

5

integration

description,

22

,

34

,

48

diagram, system,

35

,

49

interface setup, IC-CAP,

89

interference standards,

61

isolation calibration,

114

L

LAN/GPIB gateway

configuration procedure,

89

default server address,

89

GPIB address,

56

overview,

57

LCR meter

functional verification,

100

functional verification procedure,

manual,

130

GPIB address,

56

options, setting in IC-CAP,

100

overview,

34

troubleshooting,

104

line power

activating system,

87

cables,

71

requirements

circuit sharing

,

64

supply capability

,

64

M

maintenance, connector,

112

manual part number,

71

markings, instrument,

5

measurement

accuracy, enhancing,

112

calibration,

115

description

,

114

procedure

,

115

DC characterization, using IC-CAP,

99

errors, correcting,

114

uncertainties

correcting

,

115

reflection

,

143

transmission

,

144

model/part numbers,

69

mounting plates, probe station,

69

N

network analyzer

calibration

cycle

,

117

procedure

,

98

,

116

connections, system,

28

,

36

,

50

,

52

functional verification procedure,

manual,

124

GPIB address,

56

options, setting IC-CAP,

97

overview,

20

specification summary, performance,

142

noise requirements, compliance with,

9

O

operating system requirements, controller,

59

output power, maximum,

142

P

panels

feedthrough,

71

filler,

72

parameter analyzer

calibration cycle,

117

functional verification procedure,

manual,

121

GPIB address,

56

parametric measurement solution

calibration cycle,

117

connections, system,

28

,

36

,

50

,

52

GPIB address,

56

specifications,

62

parts, replaceable

list of,

69

ordering,

106

power, maximum output,

142

precision parametric measurement solution

GPIB address,

56

procedures

activating system line power,

87

bias network connection,

80

calibration, measurement,

115

floating ground measurement,

78

functional verification

dynamic signal analyzer

,

134

full system

,

95

LCR meter

,

130

network analyzer

,

124

parameter analyzer

,

121

installation,

64

LAN/GPIB interface configuration in

IC-CAP,

89

removal and replacement, component,

105

safety precautions,

76

shipment reception,

65

site preparation,

64

troubleshooting, system,

104

unpacking shipment crate,

66

work surface installation,

74

R

rack

cabinet,

60

,

71

mount kit,

70

,

71

,

105

rail kits,

71

RAM requirements, controller,

59

random measurement errors,

114

receiving checklist,

69

reflection uncertainty, network analyzer,

143

relative humidity requirements,

64

removal and replacement, component,

105

replaceable parts

list of,

69

ordering,

106

required tools

crate, unpacking shipment,

66

DC source/monitor functional

verification,

120

measurement calibration,

114

modeling system functional verification,

94

network analyzer functional verification,

124

,

130

,

134

work surface installation,

74

requirements

controller

pc

,

59

UNIX

,

59

system

electrical

,

64

environmental

,

64

requirements, safety,

5

results, interpreting,

99

RF subsystem.

See network analyzer

S

safety

precautions

floating-ground measurements

,

78

general

,

76

procedure

,

76

requirements,

5

symbols, descriptions,

4

Advertising