Vpar configurations – HP MPX200 Multifunction Router User Manual

Page 169

Advertising
background image

3.

Select the correct device, select the file hpux.cfi from the HPUX folder, and save it with a
new name.

4.

Select the newly created boot option to boot from the new LUN.

vPar configurations

Pre Migration

As the data migration must be done OFFLINE, shut down the system using the recommended
procedures to shutdown the vPars and system.

Itanium servers require nPar mode for complete system shutdown.

Post Migration

When bringing up the host, bring it up as single path boot volume and storage only. Once
the first boot is complete all the remaining paths to the storage can be enabled.

To boot from the destination SAN disk, the disk must first be discovered. Follow the
recommended procedures for your system for a boot LUN discovery, select the LUN for the
booting, and boot the vPars.

vPar configurations

169

Advertising