Step 2 - Plan the Installation

It is the user’s responsibility to ensure that this equipment is installed properly according
to this manual and in conformance with all applicable codes. Consult your local
inspecting agency for information about any local, national, or international codes that
may apply.

Review all installation and wiring instructions thoroughly before proceeding.
Throughout the installation procedures, use Figure 2.1 to locate wiring termination
points and setup switches.

Figure 2.1
Component Location

ATTENTION: Only qualified electrical personnel, familiar with the
construction and operation of this equipment and the hazards involved,
should install, adjust, operate, and/or service this equipment. Read and
understand this instruction manual in its entirety before proceeding.
Failure to observe this precaution could result in severe bodily injury or
loss of life.

ATTENTION: This equipment is at line voltage when AC power is
connected. Disconnect and lockout all ungrounded conductors of the AC
power line before working on the unit. Failure to observe these
precautions could result in severe bodily injury or loss of life.

ATTENTION: The user is responsible for conforming with all applicable
local, national, and international codes. Failure to observe this precaution
could result in personal injury and/or damage to, or destruction of, the
equipment.

PE

DC+

DC-

DBR

T/L3

S/L2

R/L1

Control Signal
Terminal Block

Ground/
Protective Earth

AC Input Power
Terminal Block

Setup DIP
Switches

Max Speed
Switch

Accel/Decel
Switch

Display Board
Connector

Advertising