11.

Install the lamp cover back onto the lamp

housing. The widest part faces the user. Do
not try to install in the wrong orientation.

12.

Tighten the four (4) captive thumbscrews

on the lamp cover.

Do not use tools to tighten these screws, as
the heat cycling of the instrument may
make them hard to remove. Hand-tight is
sufficient.

13.

Close the instrument. Apply power to warm up the instrument.

14.

Enter Vision Software and connect to the instrument.

15.

Run Wavelength Linearization.

16.

Run a new Reference Standardization.

17.

Run Instrument Calibration.

18.

Run Performance Test.

11.3

Fuse Replacement

Fuse Replacement is an unusual event, and usually is caused by some electrical fault. The electrical
fault should always be investigated and repaired before fuse replacement. Once the fault is found
and corrected, this procedure should be followed: