Metrohm NIRS XDS Process Analyzer – MicroBundle User Manual

Page 78

Advertising
background image

76

▪▪▪▪▪▪▪

This adjustment is performed using the
Interactance Reflectance probe barrel
supplied, and applies to both Interactance
Reflectance and Interactance Immersion. (The
DCM for Interactance Immersion may be used
for this operation.)

Vision takes an instrument reference, using
the internal reference fiber. This takes about
20 seconds.

This dialog box is displayed.

Next a scan is taken (on the reference) and this box is
displayed. This takes about 20-30 seconds.

Wavelength Linearization is performed in two sections, each
of which takes about 15 seconds.

Following Wavelength Linearization, the user is asked to
select a standard file. This is provided on the diskette in the
Certified Standard box. It may be manually copied on the
computer in the Vision directory, as shown.

Select this file and click on “Open”.

Advertising