Metrohm NIRS XDS Process Analyzer – MicroBundle User Manual

Page 41

Advertising
background image

▪▪▪▪▪▪▪

39

L1, Neutral

L2, HOT

Ground

Intl: Blue

US: White

Intl: Brown

US: Black

Intl: Green/Yellow

US: Green

12.

Attach Grounds to the Ground Lug inside the Base Unit of the EPCU.

13.

The wiring diagram on page 13 of the BEBCO Industries Series 4000 manual is shown for

reference. Refer to the actual diagram for complete wiring particulars.

Follow the actual wiring diagram in the BEBCO manual.

14.

Verify that all wires are secure and that the clamping screws are tight.

15.

Rotate the Main Power Wiring Header to the correct position to snap in place in the base

unit. This will require arranging the wires neatly out of the way to place the header in
position. Snap firmly into the base unit. (Refer to step 7 to see the original position.)

16.

Using proper anti-static (ESD) protection, push the Encapsulated Intrinsic Safety Module

(EISM) straight inward, using the guide slots. Push firmly into place.

17.

Tighten the two screws that hold the Encapsulated Intrinsic Safety Module (EISM) to the base

unit.

18.

Snap the wired headers into position on the Encapsulated Intrinsic Safety Module (EISM).

Advertising