Day intervals – Baseline Systems BaseStation 3200 User Manual

Page 63

Advertising
background image

C h a p t e r 5 – R e f e r e n c e

Page 61

Baseline 3200

Program Water Windows

Enter the water windows screen by highlighting
the Set Water Window menu and then press the
ENTR key. A sample screen is shown to the right.

Water windows can be set for either Weekly
(shown on the screen shot) or daily – when
moving from weekly to daily, the weekly settings
are copied to each day of the week.

Selecting daily water windows gives you hourly
control of watering for each day of the week, and
for each program. A white square will pause
watering for that hour.

Use the Set All To function to set all the windows
ON or OFF and then select the individual windows to change using the NEXT/PREV keys to select
the window and the + or – keys to change the setting.

Day Intervals

This dial position is used to specify the calendar days that
will allow watering for each program. There are five
different day interval modes, each providing a different
calendar scheduling methodology.

A program that is started on one day will continue to run until it
completes, even if it needs to continue to the next day, even if the next
day is not a water day – this means starting a six hour program at 10 PM
on Monday will finish up at 4 AM on Tuesday, even if Tuesday is not a yes
day..

Press ENTR to quickly move to the next program.

Seven Day Schedule

This is the default for new programs and uses a
seven day schedule to determine possible
watering days. The individual days of the week
can be set to either yes or no (‘-‘). A yes on a day
will allow a start time to start the program.

Historical ET Calendar

Please refer to a previous section that covers this
programming in detail. See page 38 – Historical
ET Calendar.

Advertising