Connecting the ac power transformer – Interlogix Concord Express Installation Manual User Manual

Page 29

Advertising
background image

Chapter 1

Concord Express Installation Instructions

23

To connect the DB-8 cord to the panel terminals and RJ-31X jack:

1. Connect the green, brown, gray, and red flying leads from the DB-8 cord to

panel terminals 18, 19, 20, and 21 (see Figure 17 below).

2. Insert the DB-8 cord plug into the RJ-31X (see Figure 17 below).

Figure 17: Connecting the DB8 cord

3. Check the phones on the premises for dial tone and the ability to dial out and

make phone calls. If phones do not work correctly, check all wiring and
correct where necessary. Proceed to the “Troubleshooting” on page 76 of this
manual if problems persist.

Connecting the AC Power Transformer

Note

: If you plan on connecting an alphanumeric touchpad to the programming

touchpad header on the panel, do not connect it until after the panel is powered
up. Refer to “Entering Programming Mode.”

The panel must be powered by a plug-in stepdown transformer that supplies 16.5
VAC, 25 VA (60-822 or 60-679-CN). Connect the power transformer to the panel
as shown in Figure 18 on page 24.

Caution:

Do not plug in the power transformer at this time. The panel must be

powered up using the sequence of steps described in “Powering Up the Panel”
on page 24.

Advertising