Beacon housings, Jt20 operator’s manual – Ditch Witch JT20 User Manual

Page 128

Advertising
background image

JT20 Operator’s Manual

Systems and Equipment - 127

Downhole Tools

CMW

®

Installation

Remove all paint from mating surfaces before attaching any bit to housing. Install screws (p/n 107-277)
and tighten to 120 ft•lb (163 N•m).

Beacon Housings

Lid Installation

1.

Clean all threads, bolt holes, and mating surfaces.

2.

Use removable thread locker (Loctite® 242 or equivalent), if desired.

3.

Tighten bolts to 60-70 ft•lb (81-95 N•m).

4.

Repeat tightening sequence.

Soil

Description

sandy soil

sugar sand, blow sand, or other soils where sand is the predominant component

soft soil

sandy loam

medium soil

loams, loamy clays

hard soil

packed clays, gumbo, all compacted soils

rocky soil

chunk rock, glacial till, cobble, rip rap, gravel

soft rock

soft limestone, sandstone, shale, coral, caliche

hard rock

granite, schist, marble, hard limestone

Advertising