Unload, Jt20 operator’s manual – Ditch Witch JT20 User Manual

Page 84

Advertising
background image

JT20 Operator’s Manual

Transport - 83

Haul

CMW

®

Unload

With Tiedown Kit

1.

Lower ramps.

2.

Remove tiedowns.

3.

Start drilling unit engine.

4.

Using tethered ground drive controller, pull power mode switch into low position.

5.

Raise stabilizers.

6.

Move drilling unit forward until track meets chock.

7.

Raise drill frame.

8.

Slowly back unit down trailer or ramps.

Without Tiedown Kit

1.

Lower ramps.

2.

Remove tiedowns.

3.

Start drilling unit engine.

4.

Using tethered ground drive controller, pull power mode switch into low position.

5.

Raise stabilizers.

6.

Raise drill frame.

7.

Slowly back unit down trailer or ramps.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

To help avoid injury:

Attach trailer to vehicle before loading or unloading.

Load and unload trailer on level ground.

Ensure trailer wheels are blocked.

Advertising