Drilling, Jt20 operator’s manual – Ditch Witch JT20 User Manual
Page 24
Advertising
JT20 Operator’s Manual
Operation Overview - 23
Drilling
CMW
®
Drilling
1.
2.
Engage tracker control if desired. See page 123.
3.
Drill first pipe. See page 95.
4.
Record bore path. See page 102.
5.
Enable automated pipeloader system. See page 95.
6.
7.
Drill remaining pipes in pipe box.
•
Correct direction. See page 98.
•
Engage cruise control. See page 142.
•
8.
Add up to a single column of drill pipe to empty box (see page 137) to complete bore.
9.
Advertising