Tie down, Jt20 operator’s manual – Ditch Witch JT20 User Manual
Page 82
JT20 Operator’s Manual
Transport - 81
Haul
CMW
®
5.
Lower stabilizers to trailer floor.
6.
Lower drill frame to trailer floor.
7.
Stop engine when unit is safely positioned on trailer bed for proper tongue weight.
8.
Attach tiedowns to drilling unit where indicated on page 81.
Tie Down
Points
Tiedown points are identified by tiedown decals. Securing to trailer at other
points is unsafe and can damage machinery.
Procedure
With Tiedown Kit
Loop tiedowns around rear tiedown points. Make sure tiedowns are tight before transporting.
Incorrect procedures could result in death, injury, or property damage.
Learn to use equipment correctly.
NOTICE: Wrenches can open after engine shutdown. Ensure that any downhole tool or pipe in tool joint
vises is attached to spindle or removed before transport.