Systems and Equipment - 141

Pipeloader

CMW

®

Remove Single Pipe

Unload all drill pipe loaded with auxiliary pipe loaders.

1.

Lift, rotate, and lock pipe positioning aid (3) into
stowed position.

2.

Ensure pipe box is positioned properly.

3.

Move shuttles out fully.

4.

Pull pin (2) on shuttle, rotate auxiliary pipe loader
(1) down, and install pin.

5.

Repeat process for other shuttle.

6.

Raise pipe.

7.

Move pipe to auxiliary pipe loaders.

Move shuttles in.

Lower pipe into auxiliary pipe loaders.

8.

Move shuttles out.

9.

Remove pipe from auxiliary pipe loaders and store properly.

10. Repeat steps 5-8 to unload remaining added drill pipe.

11. After all added drill pipe is unloaded with auxiliary pipe loaders:

Close both auxiliary pipe loaders.

Step away from pipeloader.

Finish loading remaining drill pipe using standard procedure.

Crushing weight. If load falls or moves it could kill or crush you.

Use proper procedures and equipment or stay away.