Select start and end points, Jt20 operator’s manual – Ditch Witch JT20 User Manual

Page 64

Advertising
background image

JT20 Operator’s Manual

Prepare - 63

Inspect Site

CMW

®

Select Start and End Points

Select one end to use as a starting point. Consider the following when selecting a starting point:

Slope

Fluid system should be parked on a level site. Consider how slope will affect drilling unit setup, bending
pipe, and fluid flow out of hole.

Traffic

Vehicle and pedestrian traffic must be a safe distance from drilling equipment. Allow at least 10’ (3 m)
buffer zone around equipment.

Space

Check that starting and ending points allow enough space for gradual pipe bending. See “Minimum
Setback” on page 69.

Check that there is enough space to work and to set up electric strike system.

Comfort

Consider shade, wind, fumes, and other site features.

Drill downhill when possible so fluid will flow away from drilling unit.

Advertising