Planning, Setting up at jobsite, Jt20 operator’s manual – Ditch Witch JT20 User Manual
Page 23
Advertising
Operation Overview - 22
JT20 Operator’s Manual
Planning
CMW
®
Planning
1.
Gather information about jobsite. See page 61.
2.
3.
Classify jobsite. See page 64.
4.
5.
Check supplies and prepare equipment. See page 72.
6.
Setting Up at Jobsite
1.
2.
Unload drilling unit from trailer. See page 83.
3.
Assemble drill string. See page 93.
4.
Position drilling unit and drill frame. See page 89.
5.
Assemble strike system. See page 113.
6.
Anchor drilling unit. See page 111.
7.
Connect fluid system. See page 89.
8.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
Advertising