Jt20 operator’s manual – Ditch Witch JT20 User Manual

Page 58

Advertising
background image

JT20 Operator’s Manual

Controls - 57

ESID

CMW

®

7.

Electrical power supply
indicator

Green light means control
box has sufficient electrical
power for operation.

Strike system is ready to
operate if OK indicator is also
on.

8.

Self test button

To start manual self test,
press.

To reset system after a strike
has been detected, press.

Checks all systems and circuits.

NOTICE: See “If an Electric Line is
Damaged” on page 18.

Item

Description

Notes

Advertising