Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual

Page 109

Advertising
background image

Conduct a Bore - 109

JT30 /JT30 All Terrain Operator’s Manual

Assemble Drill String

CMW

Prepare Beacon Housing

1.

Select nozzles and bit.

2.

Insert nozzle into beacon housing.

3.

Attach bit to beacon housing.

4.

Install beacon, following beacon instructions for:

battery replacement

beacon positioning.

5.

Install beacon housing lid.

6.

Follow beacon instructions to check beacon operation.

7.

Follow tracker instructions to calibrate beacon.

Attach Transition Sub

1.

Remove blocks from pipe guides.

2.

Pull transition sub into front wrench.

3.

Close wrench.

4.

Lube joints.

5.

Use machine torque to tighten joint fully.

Attach Beacon Housing

Use machine torque to attach beacon housing.

1.

Pull beacon housing into front wrench.

2.

Close wrench.

3.

Use machine torque to tighten joint fully.

IMPORTANT: A variety of nozzles and bits are available to suit your particular job conditions.
See page 146 for more information, or contact your Ditch Witch dealer.

Advertising
This manual is related to the following products: