Operation, Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual

Page 167

Advertising
background image

Systems and Equipment - 167

JT30 /JT30 All Terrain Operator’s Manual

Wireline Tracking

CMW

Operation

1.

Connect drill head, transition sub, and wireline beacon housing.

2.

Drill first pipe. After first pipe is downhole, clamp pipe in wrenches.

3.

Position next pipe in shuttles.

Incorrect procedures could result in death, injury, or property damage.

Learn to use equipment correctly.

Turning shaft will kill you or crush arm or leg. Stay away.

To help avoid injury: Ensure that thrust and rotation are disabled while tracking
specialist is working at front and rear of machine.

Moving parts could cut off hand or foot. Stay away.

To help avoid injury:

DO NOT operate pipe box, pipeloading, anchor, setup controls, or any other controls while tracking
specialist is making wireline connections.

Maintain constant two-way communication with tracking specialist.

Advertising
This manual is related to the following products: